We have been commissioned Benedict Phillips to create barometer that controls a 4 storey light installation for the new NHS LIFT centre in Hull.  Working with our good friend OomLout, were going to use ardunio technology to connect a weather station sensor to light tape strips situated around the outside of the building.  The light tape will change colour depending on the air pressure and other weather conditions.  This also connects to a bespoke designed traditional barometer in the entrance hall of the building.

The building is set for completion in 2011.  But we start designing the technology in spring 2010. More to come later.